|
PROPOSED PROJECTS FOR INTERNATIONAL ECONOMIC & TECHNICAL COOPERATION IN NINGBO IN 2005 |
Industry: infrastructure |
March 10, 2005 |
Project name |
Rebuilding of Chenhua-Baifeng Section of National Highway No. 329 and Transfer of Beilun Section of State Coastal Expressway |
Cooperation form |
Equity JV or solely foreign owned |
Project description |
Production scheme
Construction plan
Market analysis
Operation scale
Sales forecast |
Project scale: Chenhua-Baifeng section of national highway No. 329 with full length of 16.877km and Beilun section of State Coastal Expressway with full length of 25.99km.
The Chenhua-Baifeng section of national highway No. 329 is designed to vehicle speed of 100km/h and roadbed width of 40m. The Beilun section of the State Coastal Expressway starts from Baifeng, passes by Guoju, Shangyang, Kunting and Chunxiao and reaches Yinzishan, with full length of 25.99km; it is designed to vehicle speed of 60km/h and roadbed width of 22.5m.
Beilun Port is in a period of fast growth. In 2004, the port realized cargo throughput of 220 million ton, ranking second in mainland China. Its container throughput reached 4 million TEU, with year-on-year increase leading all domestic ports. As different industries are concentrated in the region, there is increasing demand for improved road transportation facility to accommodate the logistics operations. The highway was already put into trial use in November 2004 and the toll gate is being built. A foreign investor is sought, to whom the highway will be transferred in whole.
Annual operating income is forecasted at RMB 167 million and annual profit at RMB 50 million. |
Equipment import & material supply |
|
Investment estimate & cost efficiency
|
Total investment |
USD90 million |
Registered capital |
USD30 million |
Annual sales |
RMB167 million |
Anticipated means of investment from foreign partner |
Annual profit |
RMB50 million |
Foreign exchange |
Technology |
Equipment |
Brand name |
Others |
Internal return rate |
7.48% |
a |
|
|
|
|
Payback period |
10 yrs |
Basic facts of Chinese partner (ownership, total and fixed assets, current products and sales, current equipment and technology, support facility, etc.) |
The Economic Development Bureau of Ningbo Development Zone is charged with the foreign economic cooperation, foreign trade and foreign affairs of Beilun District. It is responsible for investment promotion for this project. |
Project location & geographic advantage |
The project is an important transportation link between Ningbo and the rest of the country. The huge cargo flow in the region will generate huge market for the project. |
Project status quo |
Already open to traffic |
Project data available |
Project FS |
Organization to contact |
Economic Development Bureau of Ningbo Development Zone |
Person to contact |
Yang Shiye |
Address |
4/F, Chuangye Building, 477 Mingzhou West Road, Beilun District, Ningbo |
Postcode |
315800 |
Telephone |
0086-574-86783518 |
Fax |
0086-574-86783519 |
E-mail |
ysye@mail.nbptt.zj.cn |
Website |
www.blol.com.cn |
|
Ningbo Foreign Investment Development Board
Add:18/F, 190 lingqiao Road, Ningbo, China
Code:315000
Tel:86-574-87315792(NO.1 DEPT),87313267(NO.2 DEPT),87322285(NO.3 DEPT)
Fax:86-574-87315992,87315873
E-mail:service@ningbochina.com, invest@ningbochina.com
Website:Http://www.ningbochina.com
|
|